{"id":208,"date":"2026-10-20T05:20:51","date_gmt":"2026-10-20T09:20:51","guid":{"rendered":"https:\/\/blackbadgedoors.com\/blogs\/news\/custom-dimensions.html"},"modified":"2026-10-20T05:20:53","modified_gmt":"2026-10-20T09:20:53","slug":"custom-dimensions","status":"publish","type":"post","link":"https:\/\/blackbadgedoors.com\/blogs\/news\/custom-dimensions.html","title":{"rendered":"Custom Dimensions for Steel Windows: How to Measure Right"},"content":{"rendered":"<p>You&#039;re ready to approve the steel windows. The elevations look right, the sightlines are settled, and the contractor has sent over opening sizes. Before those numbers become fabrication instructions, there&#039;s a question worth asking: did someone measure the actual openings, or copy dimensions from the drawings?<\/p>\n<p>That distinction matters. A custom frame needs to fit the wall that exists, not just the wall the architect intended.<\/p>\n<h2>Table of Contents<\/h2>\n<ul>\n<li><a href=\"#why-custom-dimensions-demand-more-than-a-tape-measure\">Why Custom Dimensions Demand More Than a Tape Measure<\/a><ul>\n<li><a href=\"#the-drawing-establishes-intent\">The drawing establishes intent<\/a><\/li>\n<li><a href=\"#assign-responsibility-before-taking-measurements\">Assign responsibility before taking measurements<\/a><\/li>\n<\/ul>\n<\/li>\n<li><a href=\"#rough-openings-vs-finished-openings-explained\">Rough Openings vs Finished Openings Explained<\/a><ul>\n<li><a href=\"#give-each-boundary-its-own-label\">Give each boundary its own label<\/a><\/li>\n<li><a href=\"#draw-the-dimension-you-actually-mean\">Draw the dimension you actually mean<\/a><\/li>\n<\/ul>\n<\/li>\n<li><a href=\"#how-to-measure-your-opening-step-by-step\">How to Measure Your Opening Step by Step<\/a><ul>\n<li><a href=\"#record-the-opening-before-deriving-the-order-size\">Record the opening before deriving the order size<\/a><\/li>\n<li><a href=\"#stop-when-the-geometry-needs-a-decision\">Stop when the geometry needs a decision<\/a><\/li>\n<\/ul>\n<\/li>\n<li><a href=\"#understanding-tolerances-before-you-order\">Understanding Tolerances Before You Order<\/a><ul>\n<li><a href=\"#manufacturing-vs-installation-tolerances\">Manufacturing vs Installation Tolerances<\/a><\/li>\n<li><a href=\"#review-the-complete-perimeter-detail\">Review the complete perimeter detail<\/a><\/li>\n<\/ul>\n<\/li>\n<li><a href=\"#measuring-arches-and-irregular-openings\">Measuring Arches and Irregular Openings<\/a><ul>\n<li><a href=\"#establish-a-reference-line\">Establish a reference line<\/a><\/li>\n<li><a href=\"#use-templates-to-settle-uncertainty\">Use templates to settle uncertainty<\/a><\/li>\n<\/ul>\n<\/li>\n<li><a href=\"#final-checklist-before-you-place-your-order\">Final Checklist Before You Place Your Order<\/a><ul>\n<li><a href=\"#close-the-outstanding-decisions\">Close the outstanding decisions<\/a><\/li>\n<li><a href=\"#keep-coordination-separate-from-verification\">Keep coordination separate from verification<\/a><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><a id=\"why-custom-dimensions-demand-more-than-a-tape-measure\"><\/a><\/p>\n<h2>Why Custom Dimensions Demand More Than a Tape Measure<\/h2>\n<p>Consider a homeowner who measures across the middle of a masonry opening and submits that width as the order size. The measurement itself might be accurate. The mistake is assuming it describes the entire opening and the frame that belongs inside it.<\/p>\n<p>If a jamb leans inward near the head, the delivered frame can meet resistance before it reaches its installation position. Even where the frame physically enters, the installer may have no usable room to align it or form the specified perimeter joint. That&#039;s a hypothetical scenario, not a project case study, but it illustrates the difference between <strong>measuring a hole and specifying a unit<\/strong>.<\/p>\n<p><figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/blackbadgedoors.com\/blogs\/news\/wp-content\/uploads\/2026\/10\/custom-dimensions-window-measurement-1.jpg\" alt=\"A hand measuring a steel window frame with a yellow tape measure on a wooden table.\" \/><\/figure><\/p>\n<p><a id=\"the-drawing-establishes-intent\"><\/a><\/p>\n<h3>The drawing establishes intent<\/h3>\n<p>An architectural elevation establishes the intended geometry and relationship to the building. It doesn&#039;t establish the final manufacturing dimension unless the project team has reconciled it with site conditions.<\/p>\n<p>For masonry openings, the cited model-code provisions permit dimensions from <strong>1\/4 inch smaller to 1\/2 inch larger<\/strong> than the approved-plan dimension, demonstrating why a drawing dimension isn&#039;t a substitute for field verification (<a href=\"https:\/\/up.codes\/s\/masonry-opening-tolerances\">masonry opening tolerances<\/a>). Those allowances describe construction variation, not permission to order a frame without checking the opening.<\/p>\n<p>For anyone comparing <a href=\"https:\/\/blackbadgedoors.com\/blogs\/news\/residential-steel-windows\">residential steel window configurations<\/a>, appearance is only part of the specification. The selected profile, installation detail, surrounding finishes, and actual wall conditions need to agree before fabrication begins.<\/p>\n<blockquote>\n<p><strong>Practical rule:<\/strong> Treat a drawing dimension as design information until the person responsible for field verification confirms it.<\/p>\n<\/blockquote>\n<p><a id=\"assign-responsibility-before-taking-measurements\"><\/a><\/p>\n<h3>Assign responsibility before taking measurements<\/h3>\n<p>My recommendation is to establish who measures, who interprets the measurements, and who authorizes fabrication. A homeowner can collect useful preliminary information, but the manufacturer and installer should agree on what constitutes a release-ready survey.<\/p>\n<p>Ask the surveyor to identify the substrate, the intended frame position within the wall, and any work still to be completed around the opening. An unresolved sill or unfinished jamb shouldn&#039;t disappear behind a neatly typed width and height.<\/p>\n<p><strong>Custom dimensions are documented manufacturing instructions<\/strong>, not a request for something outside a catalog size. The useful deliverable is a measurement record that lets the manufacturer understand what was measured, where it was measured, and what still needs resolving.<\/p>\n<p><a id=\"rough-openings-vs-finished-openings-explained\"><\/a><\/p>\n<h2>Rough Openings vs Finished Openings Explained<\/h2>\n<p>The phrase <em>opening size<\/em> is too ambiguous for a fabrication order. It might mean the structural hole, the space between finished surfaces, or the passage remaining when a door or window is open.<\/p>\n<p>The practical distinction is straightforward: <strong>the wall opening, the manufactured assembly, and the usable opening describe different boundaries<\/strong>. Labeling them explicitly prevents the manufacturer from having to infer your intent.<\/p>\n<p><figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/blackbadgedoors.com\/blogs\/news\/wp-content\/uploads\/2026\/10\/custom-dimensions-window-openings.jpg\" alt=\"A diagram comparing field-verified rough opening, ordered unit size, and functional clear opening for window installations.\" \/><\/figure><\/p>\n<p><a id=\"give-each-boundary-its-own-label\"><\/a><\/p>\n<h3>Give each boundary its own label<\/h3>\n\n<figure class=\"wp-block-table\"><table><tr>\n<th>Dimension label<\/th>\n<th>What it describes<\/th>\n<th>What to request<\/th>\n<\/tr>\n<tr>\n<td><strong>Rough or structural opening<\/strong><\/td>\n<td>The opening in the supporting wall before the assembly is installed<\/td>\n<td>Field dimensions tied to identified structural surfaces<\/td>\n<\/tr>\n<tr>\n<td><strong>Finished opening<\/strong><\/td>\n<td>The opening between completed surrounding surfaces<\/td>\n<td>Finish thicknesses and the surfaces used as measurement references<\/td>\n<\/tr>\n<tr>\n<td><strong>Outside frame or unit size<\/strong><\/td>\n<td>The manufacturer&#039;s overall assembly dimensions<\/td>\n<td>Explicit outside-frame dimensions on the shop drawing<\/td>\n<\/tr>\n<tr>\n<td><strong>Leaf size<\/strong><\/td>\n<td>The operable door panel, rather than the whole assembly<\/td>\n<td>A separate panel dimension where needed<\/td>\n<\/tr>\n<tr>\n<td><strong>Functional clear opening<\/strong><\/td>\n<td>The usable opening in the required operating position<\/td>\n<td>A dimension accounting for the selected frame, operation, and hardware<\/td>\n<\/tr>\n<\/table><\/figure>\n<p>A generous-looking door on an elevation doesn&#039;t establish its usable passage. Frames, leaves, hardware, thresholds, and operating geometry must be considered when confirming the functional opening.<\/p>\n<p>The supplied <a href=\"https:\/\/remodelcalculators.com\/window-calculator\">measurement and opening-size guidance<\/a> distinguishes the sizing problem from usable passage and identifies a California provision requiring a door at least <strong>36 inches wide<\/strong> with a minimum <strong>32-inch clear opening at 90 degrees<\/strong>. Treat that as a jurisdiction-specific example, not a universal requirement for every residential door.<\/p>\n<p><a id=\"draw-the-dimension-you-actually-mean\"><\/a><\/p>\n<h3>Draw the dimension you actually mean<\/h3>\n<p>For shop-drawing review, I recommend separate dimension strings for the structural opening and the outside frame. Show the installation relationship in a section detail, then identify any required clear opening on the operating view.<\/p>\n<p>Use named reference surfaces rather than an unexplained rectangle. A dimension taken between masonry faces isn&#039;t the same instruction as a dimension taken between plaster returns.<\/p>\n<ul>\n<li><strong>For the architect:<\/strong> State the required functional outcome, including applicable accessibility or egress criteria.<\/li>\n<li><strong>For the installer:<\/strong> Identify the actual installation surfaces and finish conditions.<\/li>\n<li><strong>For the manufacturer:<\/strong> Return the proposed unit dimensions and the corresponding clear opening for review.<\/li>\n<\/ul>\n<p>Don&#039;t calculate usable passage by applying a guessed deduction to the rough opening. Ask for the dimension from the selected assembly. That keeps hardware and frame decisions attached to the performance requirement rather than treating them as details to resolve after ordering.<\/p>\n<p><a id=\"how-to-measure-your-opening-step-by-step\"><\/a><\/p>\n<h2>How to Measure Your Opening Step by Step<\/h2>\n<p>Bring a tape measure, spirit level, a straightedge suited to the opening, a camera, and a measurement sheet with a sketch. Mark which face is interior and which is exterior before recording anything, so photographs and drawings use the same orientation.<\/p>\n<p>The key measurement sequence is to take width at the sill, mid-height, and head; height at both jambs and the center; retain the smallest values; and check plumb, level, and both diagonals. The installation guidance also sets a default limit of <strong>6 mm (1\/4 inch) from square unless otherwise specified<\/strong>, while requiring rough-opening dimensions to follow the manufacturer&#039;s instructions (<a href=\"https:\/\/cdn2.hubspot.net\/hubfs\/473594\/FMA%20AAMA%20WDMA%20500-16.pd.pdf\">FMA\/AAMA\/WDMA installation guidance<\/a>).<\/p>\n<p><a id=\"record-the-opening-before-deriving-the-order-size\"><\/a><\/p>\n<h3>Record the opening before deriving the order size<\/h3>\n<p>Start with the horizontal measurements. Keep the tape on the reference surfaces that will govern installation, rather than switching between masonry, trim, and plaster.<\/p>\n<p>Repeat vertically, and record opening depth and wall thickness separately. Note any projections, changes in substrate, or unfinished areas instead of trying to absorb them into a single dimension.<\/p>\n<p><strong>The smallest measurement governs because the frame must pass the tightest constraint.<\/strong> An average describes neither the narrowest point nor a reliable fitting envelope.<\/p>\n<blockquote>\n<p>The smallest measured width and height are survey results, not automatically the dimensions to order.<\/p>\n<\/blockquote>\n<p>A rectangular frame also needs a usable rectangular space. Comparing diagonals helps identify an out-of-square opening, while the level reveals leaning jambs and a sloping sill or head. Don&#039;t assume that selecting the smallest width and height compensates for every geometric defect.<\/p>\n<p><a id=\"stop-when-the-geometry-needs-a-decision\"><\/a><\/p>\n<h3>Stop when the geometry needs a decision<\/h3>\n<p>If the opening falls outside the applicable installation requirements, send the measurements to the installer and manufacturer before release. Ask whether the opening needs correction or whether a revised, properly detailed assembly can work.<\/p>\n<p>For larger assemblies, including <a href=\"https:\/\/blackbadgedoors.com\/blogs\/news\/custom-patio-door-sizes\">custom patio door sizes<\/a>, show mullion positions and the intended panel arrangement on the survey. A total span alone doesn&#039;t tell the fabricator where intermediate interfaces belong.<\/p>\n<p>Use this site checklist to complete the record:<\/p>\n<ul>\n<li><strong>Dimensions:<\/strong> Keep every reading, clearly identifying the limiting measurements.<\/li>\n<li><strong>Geometry:<\/strong> Record diagonal comparisons and the location of plumb or level deviations.<\/li>\n<li><strong>Construction:<\/strong> Note wall thickness, substrate, sill condition, drainage plane, and proposed frame position.<\/li>\n<li><strong>Operation:<\/strong> Identify handing, swing direction, and glass requirements.<\/li>\n<li><strong>Photographs:<\/strong> Include an overall view and close-ups of relevant obstructions, with the tape visible where useful.<\/li>\n<\/ul>\n<p>The manufacturer can then derive the ordered size using the installation requirements. Don&#039;t erase the original readings when that calculation is complete. Keeping survey data separate from fabrication dimensions makes later review far clearer.<\/p>\n<p><a id=\"understanding-tolerances-before-you-order\"><\/a><\/p>\n<h2>Understanding Tolerances Before You Order<\/h2>\n<p><strong>Manufacturing tolerance is not installation clearance.<\/strong> The former describes permitted variation in the manufactured component; the latter is space deliberately provided between that component and the surrounding construction.<\/p>\n<p>Confusing them leads to an unhelpful argument on delivery day: the factory says the unit is within tolerance, while the installer says it won&#039;t fit. Both statements can be true.<\/p>\n<p><a id=\"manufacturing-vs-installation-tolerances\"><\/a><\/p>\n<h3>Manufacturing vs Installation Tolerances<\/h3>\n\n<figure class=\"wp-block-table\"><table><tr>\n<th>Tolerance Type<\/th>\n<th>Value<\/th>\n<th>Where It Applies<\/th>\n<\/tr>\n<tr>\n<td><strong>Default linear manufacturing tolerance<\/strong><\/td>\n<td><strong>\u00b11\/16 inch (1.6 mm)<\/strong> where no separate tolerance is specified<\/td>\n<td>Steel-door dimensions covered by <a href=\"https:\/\/steeldoor.org\/SDI-117\/\">SDI 117 manufacturing tolerances<\/a><\/td>\n<\/tr>\n<tr>\n<td><strong>Rough-opening geometric tolerance<\/strong><\/td>\n<td>Use the applicable installation requirement discussed above<\/td>\n<td>Squareness and other opening conditions before installation<\/td>\n<\/tr>\n<tr>\n<td><strong>Installation clearance<\/strong><\/td>\n<td>Manufacturer- and detail-specific<\/td>\n<td>Space needed for the specified installation materials and adjustment<\/td>\n<\/tr>\n<tr>\n<td><strong>Project-specific performance limits<\/strong><\/td>\n<td>Approved-system-specific<\/td>\n<td>Permitted sizes, configurations, glazing, and hardware<\/td>\n<\/tr>\n<\/table><\/figure>\n<p>Don&#039;t apply a steel-door manufacturing standard indiscriminately to every architectural steel window profile. Confirm the standard and tolerances governing the actual product in the order.<\/p>\n<p>Installation clearance must accommodate the selected detail, including shims, flashing, sill pans, sealants, movement, and reinforcement where required. The installation guidance already cited specifically cautions that thick flashing, rigid sill pans, gusset plates, or shims can require a larger rough opening.<\/p>\n<p><a id=\"review-the-complete-perimeter-detail\"><\/a><\/p>\n<h3>Review the complete perimeter detail<\/h3>\n<p>A frame can fit the bare wall and still conflict with the completed sill assembly. Review the section through the sill before approving the height, especially where floor buildup or a recessed threshold remains unresolved.<\/p>\n<p>Too little clearance can leave the installer unable to align the frame or construct the intended seal. Too much clearance isn&#039;t a dependable remedy either. My recommendation is to require a resolved perimeter detail rather than ask the installer to improvise around an oversized gap.<\/p>\n<blockquote>\n<p><strong>Order review:<\/strong> Ask the manufacturer to show the required installation space on the drawing, not just the outside frame dimensions.<\/p>\n<\/blockquote>\n<p>Size also affects what the assembly must do. Before approving a large operable panel, confirm hardware loads, glazing weight, allowable deflection, and the required wind, water, and air performance.<\/p>\n<p>Energy review belongs at this stage too. New York&#039;s <a href=\"https:\/\/home4.nyc.gov\/assets\/buildings\/pdf\/envelope25.pdf\">fenestration energy-documentation guidance<\/a> requires manufacturer-supplied, whole-assembly U-factors rather than center-of-glass values. Ask whether the submitted data represents the proposed configuration or whether project-specific evaluation is needed.<\/p>\n<p>For impact-rated aluminum, verify the dimensions and configuration against the tested or approved system. A visually similar non-impact assembly isn&#039;t a basis for extending an approval.<\/p>\n<p><a id=\"measuring-arches-and-irregular-openings\"><\/a><\/p>\n<h2>Measuring Arches and Irregular Openings<\/h2>\n<p>An arch needs a geometry record, not just overall width and height. For irregular work, I recommend asking the manufacturer how it wants the shape documented before making a template or marking the wall.<\/p>\n<p>The important distinction is between the <strong>existing opening&#039;s shape<\/strong> and the <strong>finished frame&#039;s intended shape<\/strong>. They may differ deliberately, but that difference must be shown and approved rather than left for the fabricator to interpret.<\/p>\n<p><figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/blackbadgedoors.com\/blogs\/news\/wp-content\/uploads\/2026\/10\/custom-dimensions-window-measurement-2.jpg\" alt=\"A craftsman in workwear measuring the arched window frame with a yellow tape measure indoors.\" \/><\/figure><\/p>\n<p><a id=\"establish-a-reference-line\"><\/a><\/p>\n<h3>Establish a reference line<\/h3>\n<p>Mark a level datum and identify the spring line, where the straight jambs transition into the curved head. Record the opening width at that transition and the rise to the crown.<\/p>\n<p>My preferred survey approach is to add widths at clearly marked elevations through the curved portion. That gives the manufacturer reference points for checking the shape instead of relying on an overall silhouette.<\/p>\n<ul>\n<li><strong>For a proposed semicircle:<\/strong> Ask the fabricator to verify that the surveyed geometry supports the intended radius.<\/li>\n<li><strong>For an asymmetric opening:<\/strong> Record each side independently rather than assuming a mirrored profile.<\/li>\n<li><strong>For a pointed or compound arch:<\/strong> Identify the apex, transitions, and changes in curvature on the sketch.<\/li>\n<li><strong>For connected panels:<\/strong> Show mullion locations against the same datum used for the surrounding opening.<\/li>\n<\/ul>\n<p>Don&#039;t describe a curve as a standard arch because it looks close from the floor. Keep design terminology attached to a dimensioned drawing.<\/p>\n<p><a id=\"use-templates-to-settle-uncertainty\"><\/a><\/p>\n<h3>Use templates to settle uncertainty<\/h3>\n<p>A cardboard or plywood template can be useful when the manufacturer needs a physical representation of a complex shape. Confirm the template material and submission method first, then label its orientation and whether it represents the structural boundary or the proposed outside frame.<\/p>\n<p>Photograph the template in position with a scale reference. I recommend recording the relationship to the frame&#039;s intended installation plane as well, rather than tracing a decorative face and assuming it represents the wall behind.<\/p>\n<p>For designs such as <a href=\"https:\/\/blackbadgedoors.com\/blogs\/news\/arch-glass-doors-interior\">arched interior glass doors<\/a>, have the drawing distinguish the fixed curved frame from the operating leaf and adjacent finishes. That makes the design review more useful than approving an attractive outline alone.<\/p>\n<p>Before shop drawings are approved, obtain signed field verification for the irregular geometry. Record unresolved discrepancies explicitly and assign someone to close them. Don&#039;t ask the factory to choose between a template, a photograph, and a conflicting dimension without written direction.<\/p>\n<p><a id=\"final-checklist-before-you-place-your-order\"><\/a><\/p>\n<h2>Final Checklist Before You Place Your Order<\/h2>\n<p>Release to fabrication should be a documented decision, not an email saying the dimensions look fine. The measurement record, installation detail, and approved shop drawing need to describe the same assembly.<\/p>\n<p>I recommend assigning separate approvals for site conditions, design requirements, and manufacturing interpretation. That doesn&#039;t require a complicated process. It requires named people accepting clearly defined information.<\/p>\n<p><a id=\"close-the-outstanding-decisions\"><\/a><\/p>\n<h3>Close the outstanding decisions<\/h3>\n<ul>\n<li><strong>Survey record:<\/strong> Confirm that the limiting measurements and geometric checks have been reviewed, with no unexplained discrepancies.<\/li>\n<li><strong>Drawing labels:<\/strong> Identify structural opening, finished surfaces, outside frame, leaf, and required clear passage wherever relevant.<\/li>\n<li><strong>Installation detail:<\/strong> Obtain the manufacturer&#039;s required clearances and resolve the sill, flashing, drainage, and finish interfaces.<\/li>\n<li><strong>Irregular geometry:<\/strong> Confirm the accepted drawing or template revision and its orientation.<\/li>\n<li><strong>Assembly requirements:<\/strong> Approve operation, glass, hardware, finish, and applicable performance documentation.<\/li>\n<li><strong>Project record:<\/strong> Retain the signed field verification, photographs, approved drawings, and fabrication release together.<\/li>\n<\/ul>\n<p><a id=\"keep-coordination-separate-from-verification\"><\/a><\/p>\n<h3>Keep coordination separate from verification<\/h3>\n<p>On a renovation involving multiple trades, keep window-order approval distinct from estimating and procurement elsewhere in the project. Teams reviewing plumbing-estimating resources can consider <a href=\"https:\/\/exayard.com\/plumbing-estimating-software\">Exayard plumbing estimating software<\/a> separately; no estimating tool should be treated as a substitute for a signed fenestration survey.<\/p>\n<p>Before release, ask a practical question: could someone who wasn&#039;t at the site understand exactly what the factory is being asked to build? If the answer depends on an undocumented conversation, add the missing instruction to the drawing.<\/p>\n<p>The strongest sign-off process preserves responsibility without hiding uncertainty. If masonry correction, flooring selection, or a performance review is still pending, mark it as pending and hold the affected dimension.<\/p>\n<p><strong>Approve the resolved assembly, not merely the dimensions on the page.<\/strong> That gives the installer a defined detail to follow and the fabricator an unambiguous instruction to build.<\/p>\n<hr>\n<p>For made-to-order steel windows and doors, including arched and multi-panel designs, visit <a href=\"https:\/\/blackbadgedoors.com\">Black Badge Doors<\/a>. Bring your field-measurement sheet, opening photographs, and performance requirements to a project consultation so the proposed dimensions can be reviewed before you approve shop drawings.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>You&#039;re ready to approve the steel windows. The elevations look right, the sightlines are settled, and the contractor has sent over opening sizes. Before those numbers become fabrication instructions, there&#039;s a question worth asking: did someone measure the actual openings, or copy dimensions from the drawings? That distinction matters. A custom frame needs to fit [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":207,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[148,151,150,15,149],"class_list":["post-208","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized","tag-custom-dimensions","tag-made-to-order-doors","tag-rough-opening","tag-steel-windows","tag-window-measurement"],"_links":{"self":[{"href":"https:\/\/blackbadgedoors.com\/blogs\/news\/wp-json\/wp\/v2\/posts\/208","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blackbadgedoors.com\/blogs\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blackbadgedoors.com\/blogs\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blackbadgedoors.com\/blogs\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/blackbadgedoors.com\/blogs\/news\/wp-json\/wp\/v2\/comments?post=208"}],"version-history":[{"count":1,"href":"https:\/\/blackbadgedoors.com\/blogs\/news\/wp-json\/wp\/v2\/posts\/208\/revisions"}],"predecessor-version":[{"id":212,"href":"https:\/\/blackbadgedoors.com\/blogs\/news\/wp-json\/wp\/v2\/posts\/208\/revisions\/212"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blackbadgedoors.com\/blogs\/news\/wp-json\/wp\/v2\/media\/207"}],"wp:attachment":[{"href":"https:\/\/blackbadgedoors.com\/blogs\/news\/wp-json\/wp\/v2\/media?parent=208"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blackbadgedoors.com\/blogs\/news\/wp-json\/wp\/v2\/categories?post=208"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blackbadgedoors.com\/blogs\/news\/wp-json\/wp\/v2\/tags?post=208"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}